| 
Hot air blimp gondola in development
|

Hot air blimp gondola in development.
|

Blimp gondola with engine installed.
|

Hot air blimp gondola being readied, note lower APU and upper
burner tanks.
|

Interior modifications are our specialty, new flat screen monitor
retrofitted, 3 day turnaround.
|
| 
New flat screen monitors installed in a G-II, 3 day turnaround.
|

New flat screen monitors installed.
|

Electrical system being modified for Electronic Flight Bags
(EFB’s)
|

Technician wiring for EFB installation.
|

Electrical system being modified for new avionics.
|
| 
VHS player being replaced with DVD changer, 2 day turnaround.
|

G-II being readied for Stage 3 hushkit installation.
|

G-II being readied for Stage 3 hushkit installation.
|

G-II being readied for Stage 3 hushkit installation.
|

G-II being readied for Stage 3 hushkit installation.
|
| 
Stage 3 modification in work, old TR’s in foreground.
|

New Stage 3 hushkits in boxes, ready for 4 day installation.
|

Stage 3 hushkit ejector shown deployed.
|

Stage 3 hushkit ejector shown deployed
|

Stage 3 hushkit ejector being installed
|
| 
G-II Stage 3 hushkit installation in work.
|

G-II Stage 3 hushkit installation in work
|

Side view of installed Stage 3 hushkit, side view
|

Cargo conversion in work.
|

Cargo conversion in work.
|
| 
Fuselage gutted for cargo conversion mod.
|

GeoSAR G-II modification in work, note tip tanks in process
of installation
|

GeoSAR G-II wiring being installed along leading edge.
|

GeoSAR G-II tip tank modification.
|

TAS upgraded lavatory service panel on a G-III.
|
| 
Special C-130 Modification for added side door.
|

Special belly pod fairings in work.
|

Layup tool shown for special belly pod fairing.
|

TAS developed belly radome for A-3.
|

A-3 with belly pod radome installed.
|
| 
Tooling in development for special belly pods on Hawker 800.
|

Tooling in development for special belly pods on Hawker 800.
|

TAS modification center with GeoSAR G-II after flight test.
|

TAS modification center.
|

GeoSAR G-II on ramp ready for mission.
|
| 
GeoSAR G-II on ramp.
|

GeoSAR G-II tip tank pods.
|

GeoSAR G-II with belly pods prior to paint.
|

GeoSAR G-II with belly pods.
|

GeoSAR G-II interior is full of equipment racks.
|
| 
GeoSAR G-II interior is full of equipment racks.
|

GeoSAR G-II over-rack storage bins
|

GeoSAR G-II interior.
|

Hawker cargo closet modification to Class B.
|

Hawker cargo closet modification to Class B.
|
| 
Hawker cargo closet mod with added doors.
|

Hawker cargo closet mod with added doors.
|

Hot Air blimp being inflated.
|

TAS developed gondola prior to flight.
|

Hot air blimp being inflated, aft view.
|
| 
Hot air blimp being inflated, front view.
|

TAS' VP&GM Scott Starkey developing EVS installtion.
|
|
|
|